Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 11/16/2026
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
53 & 55  Bridge Painting  West: Right lane,
7PM on Monday, November 16 until 6AM on Tuesday, November 17.

 
Minimal  None 
56 & 53  Bridge Painting  East: Left 2 lanes,
7PM on Tuesday, November 17 until 6AM on Wednesday, November 18. 7PM on Wednesday, November 18 until 6AM on Thursday, November 19. 7PM on Thursday, November 19 until 6AM on Friday, November 20. 7PM on Friday, November 20 until 6AM on Saturday, November 21. 7PM on Saturday, November 21 until 6AM on Sunday, November 22.

 
Minimal  None 
57 & 56  Road Work  East: Left shoulder,
7AM until 5PM on Monday, November 16.

 
Minimal  None 
57A & 57  Road Work  East: Right lane,
12AM until 4PM on Monday, November 16.

 
Minimal  None 
58 & 59  Road Work  West: Right shoulder,
7AM until 5PM on Tuesday, November 17. 7AM until 5PM on Wednesday, November 18.

 
Minimal  None 
59 & 60  Other  West: Right shoulder,
8AM until 4PM on Wednesday, November 18.

 
Minimal  None 
59 & 60  Road Work  West: Right shoulder,
7AM until 5PM on Monday, November 16.

 
Minimal  None 
59 & 61  Road Work  West: Right shoulder,
7AM until 5PM on Tuesday, November 17.

 
Minimal  None 
60 & 61  Road Work  West: Right shoulder,
7AM until 5PM on Wednesday, November 18.

West: Right shoulder,
7AM until 5PM on Thursday, November 19.

 
Minimal  None 


Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 11/16/2026
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
53 & 55  Bridge Painting  West: Right lane,
7PM on Monday, November 16 until 6AM on Tuesday, November 17.

 
Minimal  None 
56 & 53  Bridge Painting  East: Left 2 lanes,
7PM on Tuesday, November 17 until 6AM on Wednesday, November 18. 7PM on Wednesday, November 18 until 6AM on Thursday, November 19. 7PM on Thursday, November 19 until 6AM on Friday, November 20. 7PM on Friday, November 20 until 6AM on Saturday, November 21. 7PM on Saturday, November 21 until 6AM on Sunday, November 22.

 
Minimal  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
1 & 2  Highway Construction
Long Range: Pavement Rehabilitation and Safety Enhancements 
North: Left lane,
12AM on Monday, November 16 until 12AM on Friday, November 20.

 
Severe  None 
1 & 3  Highway Construction
Long Range: Pavement Rehabilitation and Safety Enhancements 
North: Left 2 lanes,
8PM on Wednesday, November 18 until 6AM on Thursday, November 19. 8PM on Thursday, November 19 until 6AM on 6AM on Friday, November 20.

 
Severe  None 
4 & 1  Highway Construction
Long Range: Pavement Rehabilitation and Safety Enhancements 
South: Left lane,
12AM on Monday, November 16 until 12AM on Friday, November 20.

South: Left 2 lanes,
10PM on Wednesday, November 18 until 6AM on Thursday, November 19. 10PM on Thursday, November 19 until 6AM on 6AM on Friday, November 20.

 
Severe  None 


Back to Top

Rochester Region


For The Week Starting Monday 11/16/2026
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
41 & 43  Road Work  West: Alternating right lane with the left lane,
MON 7PM-10PM

 
Minimal  None 
43 & 42  Road Work  East: Right lane,
TUE 5AM-11AM

 
Minimal  Weather permitting 
43 & 42  Road Work  West: Alternating right lane with the left lane,
TUE 7PM-11AM

East: Alternating right lane with the left lane,
TUE 7PM-11AM

 
Minimal  None 
43 & 46  Paving  West: Alternating right lane with the left lane,
MON-FRI 7AM-5PM MON-TUE 7PM, WED-THU 8PM, FRI 10PM TO TUE-SAT 6AM

 
Minimal  Pave full width across lanes. 
46 & 44  Paving  East: Ramp,
FRI-SAT 9PM-5AM

 
Minimal  Pave full width across lanes. 
46 & 44  Guide Rail Installation  East: Ramp,
To facilitate guiderail repairs, the exit 45 eastbound exit ramp (the ramp from I-90 east to I-490 west) will be closed from 9 PM on Friday, November 13 until 5 AM on Saturday, November 14. I-90 eastbound traffic wanting to exit at Exit 45 should use Exit 44 (Canandaigua - Route 332) and loop around to re-enter I-90 west, to Exit 45. Tandem operators should consider using Exit 48 (Batavia - Route 98) or Exit 43 (Manchester - Route 21).

 
Moderate  None 
46 & 43  Paving  East: Alternating right lane with the left lane,
MON-FRI 7AM-5PM MON-TUE 7PM, WED-THU 8PM, FRI 10PM TO TUE-SAT 6AM

 
Minimal  Pave full width across lanes. 
47 & 46  Other  West: Left lane,
7AM until 1:30PM on Wednesday, November 18.

East: Left lane,
7AM until 1:30PM on Thursday, November 19.

 
None  None 


Back to Top

Syracuse Region


For The Week Starting Monday 11/16/2026
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
32 & 34  Road Work  West: Right lane,
MON-FRI 7AM-2PM

 
Minimal  Weather permitting 
34 & 32  Road Work  East: Right lane,
MON 6AM-10AM, TUE 6AM-2PM, WED 6AM-11AM, THU 6AM-10AM

East: Shoulder,
MON 10AM-4PM, TUE 2PM-4PM WED 11AM-4PM, THU 10AM-4PM, FRI 6AM-4PM

 
Minimal  None 
33 & 34  Bridge Construction  West: Alternating right lane with the left lane,
WED 6AM-2PM

 
Minimal  None 
33 & 34  Road Work  West: Alternating right lane with the left lane,
MON-FRI 8AM-1PM

 
Minimal  Weather permitting 
34 & 33  Bridge Construction  East: Alternating right lane with the left lane,
TUE 6AM-2PM

 
Minimal  None 
34 & 33  Road Work  East: Alternating right lane with the left lane,
MON-FRI 8AM-1PM

 
Minimal  Weather permitting 
33 & 34A  Road Work  West: Left lane,
MON-WED 7PM-7AM, THU 7PM-6AM, FRI 8PM-8AM

 
None  Closure not to exceed two miles. 
35 & 34A  Road Work  East: Right shoulder,
THU-FRI 7AM-2:30PM

East: Right lane,
TUE 8AM-2PM

 
Minimal  Weather permitting 
37 & 35  Road Work  East: Alternating right lane with the left lane,
MON-WED 6:30PM-6:30AM

 
Minimal  Weather permitting 
38 & 39  Road Work  West: Alternating right lane with the left lane,
WED-THU 6:30PM-6:30AM

 
Minimal  Weather permitting 
40 & 38  Road Work  East: Right lane,
WED-THU 5PM-9AM

 
Minor  As needed mobile closures to adjust hit signs, barrels and/or assist disabled vehicles. 
40 & 39  Road Work  West: Alternating right lane with the left lane,
THU-FRI 8PM-8AM, SAT-SUN 8PM-8AM

West: Movable set-up,
MON-FRI 7AM-7PM AS NEEDED

East: Movable set-up,
MON-FRI 7AM-7PM AS NEEDED

East: Left lane,
SUN-MON 8PM-8AM, MON-TUE 5PM-12PM, TUE-WED 5PM-9AM,WED-THU 6PM-8AM

 
Minor  As needed mobile closures to adjust hit signs, barrels and/or assist disabled vehicles. 
41 & 39  Road Work  West: Right lane,
MON 6PM-2PM, TUE-WED 6PM-6AM, WED-THU 6PM-2PM, THU-FRI 6PM-12PM

East: Shoulder,
MON-FRI 7AM-7PM

East: Right lane,
TUE-WED 5AM-12PM, THU 5AM-10AM

 
Minor  As needed mobile closures to adjust hit signs, barrels and/or assist disabled vehicles. 
40 & 41  Road Work  West: Right shoulder,
MON 10AM-2PM, TUE-FRI 7:30AM-2PM

East: Right shoulder,
MON 7:30AM-10AM

West: Alternating right lane with the left lane,
MON-FRI 8PM-6:30AM

East: Alternating right lane with the left lane,
MON-FRI 8PM-6:30AM

West: Ramp,
TUE-FRI 9PM-6AM

 
Minimal  Weather permitting 
41 & 43  Road Work  West: Alternating right lane with the left lane,
MON 7PM-10PM

 
Minimal  None 
43 & 42  Road Work  East: Right lane,
TUE 5AM-11AM

 
Minimal  Weather permitting 
43 & 42  Road Work  West: Alternating right lane with the left lane,
TUE 7PM-11AM

East: Alternating right lane with the left lane,
TUE 7PM-11AM

 
Minimal  None 


Back to Top

Utica Region


For The Week Starting Monday 11/16/2026
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
29 & 29A  Other  West: Right lane,
Monday - Thursday, 7:00AM - 4:00PM; Friday, 7:00AM - 3:00PM

 
Minimal  Weather Permitting 
30 & 29A  Road Work  West: Left lane,
MON-TUE 7AM-5PM, WED 7AM-3PM, THU 7AM-5PM, FRI 7AM-noon

West: Left lane,
WED 7AM-3PM, THU 7AM-5PM, FRI 7AM-noon

West: Right lane,
WED 7AM-3PM, THU 7AM-5PM

East: Left shoulder,
TUE-THU 7AM-5PM, FRI 7AM-10AM

 
None  None 
29A & 31  Bridge Construction  West: Alternating right lane with the left lane,
MON-THU 7AM-5PM

 
Minimal  None 
31 & 32  Road Work  West: Alternating right lane with the left lane,
MON-FRI 7AM-2PM

 
Minimal  Weather permitting 
31 & 32  Bridge Construction  West: Alternating right lane with the left lane,
MON-THU 6AM-5PM, FRI 6AM-1PM

 
Minimal  None 
32 & 31  Road Work  East: Alternating right lane with the left lane,
MON-FRI 7AM-2PM

 
Minimal  Weather permitting 
32 & 34  Road Work  West: Right lane,
MON-FRI 7AM-2PM

 
Minimal  Weather permitting 
34 & 32  Road Work  East: Right lane,
MON 6AM-10AM, TUE 6AM-2PM, WED 6AM-11AM, THU 6AM-10AM

East: Shoulder,
MON 10AM-4PM, TUE 2PM-4PM WED 11AM-4PM, THU 10AM-4PM, FRI 6AM-4PM

 
Minimal  None 
33 & 34  Bridge Construction  West: Alternating right lane with the left lane,
WED 6AM-2PM

 
Minimal  None 
33 & 34  Road Work  West: Alternating right lane with the left lane,
MON-FRI 8AM-1PM

 
Minimal  Weather permitting 
34 & 33  Bridge Construction  East: Alternating right lane with the left lane,
TUE 6AM-2PM

 
Minimal  None 
34 & 33  Road Work  East: Alternating right lane with the left lane,
MON-FRI 8AM-1PM

 
Minimal  Weather permitting 
33 & 34A  Road Work  West: Left lane,
MON-WED 7PM-7AM, THU 7PM-6AM, FRI 8PM-8AM

 
None  Closure not to exceed two miles. 


Back to Top

Albany Region


For The Week Starting Monday 11/16/2026
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
B1 & 21A  Other  West: Alternating right lane with the left lane,
Wednesday & Thursday, 6:00AM - 2:00PM

 
Minimal  Weather Permitting 
21A & B1  Bridge Construction  East: Right lane,
Monday, 7:00AM - 12:00MIDNIGHT; Tuesday - Thursday, 12:00MIDMIGHT - 12:00MIDNIGHT; Friday, 12:00MIDNIGHT - 4:00PM *Night Work* *24 Hour Closure*

 
Minimal  Weather Permitting 
B1 & 21A  Bridge Work  West: Right lane,
Monday - Friday, 6:00AM - 2:00PM *24 Hour Closure*

 
Minimal  Weather Permitting 
B1 & B2  Guide Rail Installation  East: Right lane,
Monday, 6:00AM - 2:00PM

 
Minimal  Weather Permitting 
B3 & B2  Guide Rail Installation  West: Left lane,
Wednesday, 6:00AM - 2:00PM

 
Minimal  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21 & 18  Other  North: Left shoulder,
Monday - Wednesday, 6:00AM - 5:00PM; Thursday, 6:00AM - 3:00PM; Friday, 6:00AM - 10:00AM

South: Alternating right shoulder or left shoulder,
Monday - Wednesday, 6:00AM - 5:00PM; Thursday, 6:00AM - 4:00PM; Friday, 6:00AM - 10:00AM

 
Minor  Weather Permitting 
21 & 20  Bridge Work  North: Alternating right shoulder or left shoulder,
Monday - Friday, 7:00AM - 4:00PM

South: Alternating right shoulder or left shoulder,
Monday - Friday. 7:00AM - 4:00PM

 
Minimal  Weather Permitting 
20 & 21  Bridge Inspection  North: Left lane,
Tuesday, 9:00AM - 11:00AM

 
Minimal  Weather Permitting 
20 & 21  Other  North: Right shoulder,
Monday - Wednesday, 6:00AM - 5:00PM; Thursday, 6:00AM - 3:00PM; Friday, 6:00AM - 10:00AM

 
Minor  Weather Permitting 
21 & 20  Bridge Work  North: Alternating right shoulder or left shoulder,
Monday - Friday, 7:00AM - 4:00PM

South: Alternating right shoulder or left shoulder,
Monday - Friday, 7:00AM - 4:00PM

 
Minimal  Weather Permitting 
21 & 20  Bridge Inspection  South: Left lane,
Tuesday, 1:00PM - 3:00PM

 
Minimal  Weather Permitting 
21B & 21  Road Work  North: Left lane,
Friday, 7:00AM - 10:00AM

North: Right lane,
Monday, 7:00AM - 1:00PM

South: Left lane,
Thursday, 7:00AM - 1:00PM

North: Right lane,
Tuesday, 7:00AM - 1:00PM

South: Right lane,
Wednesday, 7:00AM - 1:00PM

 
None  Weather Permitting 
23 & 22  Bridge Inspection  North: Right lane,
Monday, 9:00AM - 11:00AM; Tuesday, 9:00AM - 1:00PM; Thursday, 9:00AM - 12:00 Noon

South: Right lane,
Monday, 7:00AM - 12:00 Noon; Tuesday, 7:00AM - 1:00PM; Thursday, 7:00AM - 11:00AM

 
Minor  Weather Permitting 
24 & 23  Bridge Inspection  North: Right lane,
Wednesday, 2:00PM - 3:00PM

South: Alternating right lane with the left lane,
Wednesday, 9:00AM - 12:00 Noon

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
24 & 25  Other  West: Right lane,
Monday, 7:00AM - 1:00PM

 
Minor  Weather Permitting 
25A & 25  Bridge Construction  West: Left 2 lanes,
Monday - Thursday, 8:00PM - 7:00Am *Night Work*

West: Alternating right lane with the left lane,
Monday - Thursday, 7:00AM - 3:00PM; Friday, 7:00AM - 2:00PM

East: Left 2 lanes,
Monday - Friday, 7:00PM - 6:00AM *Night Work*

East: Alternating right lane with the left lane,
Monday - Friday, 8:00AM - 6:00PM

 
None  Weather Permitting 
25 & 25A  Bridge Construction  West: Alternating right lane with the left lane,
Sunday - Monday, 12:00 Midnight - 4:00PM; Monday - Tuesday, 6:00PM - 4:00PM; Tuesday - Wednesday, 6:00PM - 3:00PM; Wednesday - Thursday, 6:00PM - 3:00PM; Thursday - Friday, 6:00PM - 2:00PM; Friday - Saturday, 6:00PM - 12:00 Midnight; Saturday - Sunday, 12:00 Midnight - 12:00 Midnight *24 Hour Closure* *Will be double left lane closures intermittently*

 
Minimal  Weather Permitting 
26 & 25  Bridge Construction  West: Left 2 lanes,
Monday - Thursday, 7:00PM - 7:00AM *Night Work*

West: Alternating right lane with the left lane,
Monday - Thursday, 7:00AM - 2:00PM; Friday, 7:00AM - 12:00 Noon

East: Alternating right lane with the left lane,
Tuesday - Thursday, 8:00AM - 3:00PM

 
None  Weather Permitting 
26 & 25  Bridge Construction  East: Alternating right lane with the left lane,
Sunday - Monday, 6:00PM - 7:00AM; Monday - Tuesday, 9:00AM - 12:00 Midnight; Tuesday - Saturday, 12:00 Midnight - 12:00 Midnight *24 Hour Closure*; Saturday - Sunday, 12:00 Midnight - 11:00AM *Will be double left lane closures intermittently*

 
Minimal  Weather Permitting 


Back to Top

Mid-Hudson Region


For The Week Starting Monday 11/16/2026
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Road Work  Direction: Interchange 19: Ramp,
Monday - Friday, 7:00AM - 1:00PM *Southbound*; Monday - Thursday, 6:00AM - 2:00PM *Northbound*

 
Minimal  Weather Permitting 
16 & 17  Bridge Inspection  North: Left lane,
Mon 8am-10am

 
Minimal  None 
16 & 17  Bridge Work  North: Alternating right lane with the left lane,
Mon-Wed 7am-3pm Thurs 7am-2pm Fri 7am-11am

 
None  None 
17 & 16  Bridge Inspection  South: Left lane,
Mon 10am-12pm

 
Minimal  None 
17 & 16  Other
Long Range: Placing aerial fiber/cable on Pinehill rd over I-87 
North: Other,
Traffic Stops Mon 11pm-3am

South: Other,
Traffic Stops Mon 11pm-3am

 
None  None 
17 & 16  Bridge Work  South: Alternating right lane with the left lane,
Mon-Tues 9am-3:30pm Wed-Thurs 9am-3pm Fri 9am-12pm

 
None  None 
17 & 19  Road Work  North: Right shoulder,
Tuesday, 6:00PM - 10:00AM; Wednesday, 8:00PM - 8:00AM; Thursday, 9:00PM - 8:00AM *NIGHT WORK*

North: Left lane,
Friday, 11:00PM - 8:00AM *Night Work*

 
Minor  Weather Permitting 
18 & 19  Road Work  North: Left lane,
Monday, 6:00PM - 8:00AM *NIGHT WORK*

 
Minor  Weather Permitting 
18 & 19  Other  North: Alternating right lane with the left lane,
Wednesday & Thursday, 8:00PM - 7:00AM *Night Work*

 
Minimal  Weather Permitting 
19 & 18  Other  South: Left shoulder,
Wednesday, 7:00AM 5:00PM; Thursday, 7:00AM - 4:00PM; Friday, 7:00AM - 10:00AM

 
Minimal  Weather Permitting 
19 & 18  Other  South: Alternating right lane with the left lane,
Wednesday & Thursday, 6:00PM - 7:00AM *Night Work*

 
Minimal  Weather Permitting 
19 & 18  Road Work  North: Alternating right lane with the left lane,
Tuesday - Wednesday 8:00AM - 12NOON

South: Right lane,
Monday, 8:00PM - 8:00AM; Tuesday, 7:00PM - 9:00AM *NIGHT WORK*

South: Alternating right lane with the left lane,
Tuesday - Wednesday, 4:00AM - 11:00AM

 
Minor  Weather Permitting 
19 & 17  Road Work  South: Right shoulder,
Wednesday, 7:00PM - 9:00AM; Thursday, 6:00PM - 9:00AM *NIGHT WORK*

South: Left lane,
Friday, 9:00PM - 9:00AM *Night Work*

 
Minor  Weather Permitting 
18 & 19  Road Work  North: Right lane,
Sunday - Thursday, 2:00AM - 7:00AM *Night Work* Monday, 9:00AM - 11:00AM; Tuesday, 9:00AM - 2:00PM; Wednesday, 9:00AM - 1:00PM

North: Alternating right lane with the left lane,
Sunday - Thursday, 2:00AM - 7:00AM *Night Work* Monday, 9:00AM - 11:00AM; Tuesday, 9:00AM - 2:00PM; Wednesday, 9:00AM - 1:00PM

 
Minimal  Weather Permitting 
18 & 21  Other  North: Left shoulder,
Monday - Wednesday, 6:00AM - 5:00PM; Thursday, 6:00AM - 3:00PM; Friday, 6:00AM - 10:00AM

 
Minor  Weather Permitting 
19 & 18  Bridge Work  South: Right lane,
Sunday - Wednesday, 10:00PM - 2:00PM; Thursday & Friday, 10:00PM - 1:00PM *Night Work*

 
Minimal  Weather Permitting 
21 & 18  Other  South: Alternating right shoulder or left shoulder,
Monday - Wednesday, 6:00AM - 5:00PM; Thursday, 6:00AM - 4:00PM; Friday, 6:00AM - 10:00AM

 
Minor  Weather Permitting 
21 & 20  Bridge Work  North: Alternating right shoulder or left shoulder,
Monday - Friday, 7:00AM - 4:00PM

South: Alternating right shoulder or left shoulder,
Monday - Friday. 7:00AM - 4:00PM

 
Minimal  Weather Permitting 
20 & 21  Bridge Inspection  North: Left lane,
Tuesday, 9:00AM - 11:00AM

 
Minimal  Weather Permitting 
20 & 21  Other  North: Right shoulder,
Monday - Wednesday, 6:00AM - 5:00PM; Thursday, 6:00AM - 3:00PM; Friday, 6:00AM - 10:00AM

 
Minor  Weather Permitting 
21 & 20  Bridge Work  North: Alternating right shoulder or left shoulder,
Monday - Friday, 7:00AM - 4:00PM

South: Alternating right shoulder or left shoulder,
Monday - Friday, 7:00AM - 4:00PM

 
Minimal  Weather Permitting 
21 & 20  Bridge Inspection  South: Left lane,
Tuesday, 1:00PM - 3:00PM

 
Minimal  Weather Permitting 


Back to Top

New York Region


For The Week Starting Monday 11/16/2026
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Paving  East: Ramp,
Exit 4 Ramp 20/21 Sun-Wed 10pm-6am Exit 5 Ramp 22 Sun-wed 10pm-6am Ramp 1 2/3 Sun-Wed 10pm-6am WEST Ramp 8 Sun-Thurs 10pm-6am Ramp 26 & 27 Sun-Tues 10pm-6am

 
None  None 
2  Shoulder Work  East: Right and center lanes,
MP 11.40-0.80 Mon, Tuesday 9pm-6am

East: Left and center lanes,
MP 11.40-0.80 Mon, Tuesday 9pm-6am

 
None  None 
2 & 3  Bridge Inspection  East: Left lane,
Mon 8pm-6am

East: Right lane,
Mon 8pm-6am

 
None  None 
4 & 1  Shoulder Work  West: Left and center lanes,
Mon 9pm-6am

West: Right and center lanes,
Mon 9pm-6am

 
None  None 
4 & 3  Bridge Inspection  West: Right lane,
Sun 9pm-6am

West: Left lane,
Sun 9pm-6am

 
None  None 
4 & 6  Shoulder Work  East: Right and center lanes,
Tues, Wed 9pm-6am

East: Left and center lanes,
Tues, Wed 9pm-6am

 
None  None 
8 & 5  Shoulder Work  West: Right and center lanes,
Mon 9pm-6am

 
None  None 
8 & 5  Paving  West: Right and center lanes,
Tues-Thurs 9pm-6am

 
None  None 
9A & 6  Paving  West: Right and center lanes,
Sun-Wed 10pm-6am

 
None  None 
9A & 8  Bridge Construction  West: Right shoulder,
RSH, RL Mon-Sat 9am-2pm

 
None  None 
10 & 9  Bridge Construction  East: Right lane,
Mon-Sat 8pm-6am Mon-Sat 10am-3pm

West: Right shoulder,
Mon-Sat 9am-2pm

 
None  None 
11 & 10  Bridge Construction  West: Right lane,
Mon-Sat 8pm-7am Mon-Sat 9am-1pm

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
7A & 8  Bridge Inspection  North: Right lane,
Fri 9pm-6am

North: Left lane,
Fri 9pm-6am

 
Minimal  None 
7A & 8  Bridge Construction  North: Right shoulder,
Mon-Sat 9am-3pm

 
None  None 
9 & 11  Bridge Painting  North: Alternating right lane with the left lane,
Sun 9am-11pm Mon-Thurs 7am-3pm Fri 7am-12pm Sat 8am-10am

North: Alternating the 2 right lanes with the left lanes,
Sun/Tues/Wed/Sat 7pm-5am Mon 8pm-5am Fri 9pm-5am

 
None  None 
12 & 9  Bridge Painting  South: Alternating the 2 right lanes with the left lanes,
Mon-Thurs & Sat 7pm-5am Fri 8pm-5am

South: Alternating right lane with the left lane,
Mon-Wed 10am-7pm Thurs 10am-5pm Fri 10am-4pm Sat 8am-2pm

 
None  None 
11 & 13  Bridge Inspection  North: Right shoulder,
RL, RSH Mon 8pm-7am

North: Right shoulder,
RL, RSH Wed 9pm-7am

 
None  None 
12 & 13  Bridge Construction  North: Right and center lanes,
ML/RL Mon-Sat 11pm-6am

North: Right shoulder,
Mon-Sat 9am-3pm

North: Right lane,
Mon-Sat 8pm-7am

 
None  None 
12 & 14  Bridge Inspection  North: Right shoulder,
RL, RSH Tues-Wed 8pm-7am

 
None  None 
13 & 11  Bridge Inspection  South: Right shoulder,
RL, RSH Thurs 9pm-6am

 
None  None 
14 & 12  Bridge Inspection  South: Right shoulder,
RL, RSH Fri 9pm-8am

 
None  None 
14 & 13  Bridge Work  North: Left and center lanes,
Wed/Thurs 9pm-6am

North: Alternating right lane with the left lane,
Tues 10pm-6am

North: Left lane,
Mon-Tues 8pm-6am

South: Right lane,
Mon/Wed 8pm-6am Thurs 9pm-6am

South: Left and center lanes,
Mon/Wed 8pm-6am Thurs 9pm-6am

 
None  None 
14 & 12  Bridge Painting  South: Left lane,
Mon/Wed 8pm-5am Tues 8pm-6am Thurs/Fri 9pm-5am Sat 11pm-6am

South: Right lane,
Mon-Wed/Fri 8pm-6am Thurs 9pm-5am Sat 11pm-8am

 
None  None 
14B & 15  Bridge Inspection  North: Right lane,
Fri 9pm-6am

North: Left lane,
Fri 9pm-6am

 
Minimal  None 
14B & 15  Shoulder Work  North: Right and center lanes,
Mon/Tues 7pm-6am Wed/Thurs 8pm-6am Fri 9pm-7am

North: Left and center lanes,
Mon/Tues 7pm-6am Wed/Thurs 8pm-6am Fri 9pm-7am

 
None  None 
14B & 15A  Other  North: Right shoulder,
Mon 7am-4pm

 
None  None 
15A & 14B  Shoulder Work  South: Right and center lanes,
Mon-Thurs 7pm-5am Fri 7pm-7am

South: Left and center lanes,
Mon-Thurs 7pm-5am Fri 7pm-7am

South: Ramp,
Wed-Fri 10pm-5am

 
None  None 
15 & 16  Other  North: Right shoulder,
Tues 7am-4pm

 
None  None 
15A & 16  Other  North: Right shoulder,
Wed 7am-4pm

North: Right shoulder,
Thurs 7am-3pm

North: Right shoulder,
Fri 7am-1pm

 
None  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
18B & 20  Paving  North: Left and center lanes,
Mon-Wed 7pm-5:30am Thurs 9pm-5am Fri 9pm-6am Sat 8pm-8am

North: Right and center lanes,
Mon-Wed 7pm-5:30am Thurs 9pm-5am Fri 9pm-6am Sat 8pm-8am

 
None  None 
22 & 18B  Paving  South: Left and center lanes,
Mon-Tues 8pm-5:30am Wed 9pm-5:30am Thurs 9pm-5am Fri 9pm-6am Sat 10pm-8am

South: Right and center lanes,
Mon-Tues 8pm-5:30am Wed 9pm-5:30am Thurs 9pm-5am Fri 9pm-6am Sat 10pm-8am

 
None  None 


Back to Top