Scheduled Construction Lane Closures

Impact Key
Minimal
Traffic moving
Minor
Delays up to 5 min.
Moderate
Delays 5-20 min.
Severe
Delays >= 20 min.

Erie Region


For The Week Starting Monday 06/22/2026
Erie Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
48 & 61  Pavement Striping  West: Ramp,
Pavement striping hand work will take place between 5 AM and 8:30 PM, Monday through Saturday, at interchanges and service area ramps between the Pembroke Travel Plaza and the PA State Line.

 
Minimal  None 
57 & 55  Bridge Work
Long Range: Exit 56 Eastbound On-Ramp Closure 
East: Alternating right lane with the left lane,
8PM on Monday, June 22 until 6AM on Tuesday, June 23. 8PM on Tuesday, June 23 until 6AM on Wednesday, June 24. 8PM on Wednesday, June 24 until 6AM on Thursday, June 25. 8PM on Thursday, June 25 until 6AM on Friday, June 26. 8PM on Friday, June 26 until 6AM on Saturday, June 27.

 
Moderate  Exit 56 Eastbound On-Ramp Closure 
56 & 57A  Other  West: Right lane,
7PM on Monday, June 22 until 7AM on Tuesday, June 23.

West: Right lane,
7PM on Tuesday, June 23 until 7AM on Wednesday, June 24.

 
Minimal  None 
56 & 57  Other  West: Right shoulder,
7AM until 12PM on Monday, June 22.

 
Minimal  None 
57 & 57A  Other  West: Right lane,
7PM on Wednesday, June 24 until 7AM on Thursday, June 25.

 
Minimal  None 
57A & 56  Other  East: Right lane,
7PM on Friday, June 26 until 7AM on Saturday, June 27.

East: Right lane,
7PM on Thursday, June 25 until 7AM on Friday, June 26.

 
Minimal  None 
61 & 48  Pavement Striping  East: Ramp,
Pavement striping hand work will take place between 5 AM and 8:30 PM, Monday through Saturday, at interchanges and service area ramps between the Pembroke Travel Plaza and the PA State Line.

 
Minimal  None 


Back to Top

Buffalo/Niagara Region


For The Week Starting Monday 06/22/2026
Buffalo/Niagara Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Bridge Work
Long Range: Exit 56 Eastbound On-Ramp Closure 
Direction: Exit 56 Eastbound On-Ramp Closure: Ramp,
10PM on Wednesday, June 24 until 6AM on Thursday, June 25. 10PM on Thursday, June 25 until 6AM on Friday, June 26.

 
Moderate  Exit 56 Eastbound On-Ramp Closure 
49 & 50  Road Work  West: Alternating right lane with the left lane,
8PM on Monday, June 22 until 6AM on Tuesday, June 23. 8PM on Tuesday, June 23 until 6AM on Wednesday, June 24. 8PM on Wednesday, June 24 until 6AM on Thursday, June 25. 8PM on Thursday, June 25 until 6AM on Friday, June 26. 8PM on Friday, June 26 until 6AM on Saturday, June 27.

 
Minimal  None 
50 & 52A  Road Work  West: Left lane,
9PM on Monday, June 22 until 6AM on Tuesday, June 23. 9PM on Tuesday, June 23 until 6AM on Wednesday, June 24. 9PM on Wednesday, June 24 until 6AM on Thursday, June 25. 9PM on Thursday, June 25 until 6AM on Friday, June 26. 9PM on Friday, June 26 until 6AM on Saturday, June 27.

 
Minimal  None 
52A & 50A  Road Work  East: Left lane,
8PM on Monday, June 22 until 6AM on Tuesday, June 23. 8PM on Tuesday, June 23 until 6AM on Wednesday, June 24. 8PM on Wednesday, June 24 until 6AM on Thursday, June 25. 8PM on Thursday, June 25 until 6AM on Friday, June 26. 8PM on Friday, June 26 until 6AM on Saturday, June 27.

 
Minimal  None 

Niagara I-190
Between Exits Work Description Lane Closure Information Likely Impacts Comments
1 & 6  Highway Construction
Long Range: Pavement Rehabilitation and Safety Enhancements 
North: Left lane,
7PM on Monday, June 22 until 6AM on Tuesday, June 23.

 
Severe  None 
1 & 4  Highway Construction
Long Range: Pavement Rehabilitation and Safety Enhancements 
North: Alternating right lane with the left lane,
10PM on Thursday, June 25 until 6AM on Friday, June 26. 10PM on Friday, June 26 until 6AM on Saturday, June 27.

North: Left lane,
10PM on Sunday, June 21 until 6AM on Monday, June 22.

 
Severe  None 
1 & 21  Pavement Striping  North: Ramp,
Pavement striping at all I-190 interchange ramps. Pavement striping hand work will take place between 5 AM and 8:30 PM, Monday through Saturday, at all I-190 interchange ramps.

 
Minimal  None 
4 & 1  Highway Construction
Long Range: Pavement Rehabilitation and Safety Enhancements 
South: Left 2 lanes,
Wednesday, June 24 from 12AM until 6AM. Thursday, June 25 from 12AM until 6AM.

South: Alternating right lane with the left lane,
10PM on Sunday, June 21 until 6AM on Monday, June 22. 10PM on Monday, June 22 until 6AM on Tuesday, June 23.

 
Severe  None 
20 & 19  Bridge Work  North: Left lane,
8PM on Monday, June 22 until 6AM on Tuesday, June 23. 8PM on Tuesday, June 23 until 6AM on Wednesday, June 24. 8PM on Wednesday, June 24 until 6AM on Thursday, June 25. 8PM on Thursday, June 25 until 6AM on Friday, June 26. 8PM on Friday, June 26 until 6AM on Saturday, June 27.

South: Alternating right lane with the left lane,
8PM on Monday, June 22 until 6AM on Tuesday, June 23. 8PM on Tuesday, June 23 until 6AM on Wednesday, June 24. 8PM on Wednesday, June 24 until 6AM on Thursday, June 25. 8PM on Thursday, June 25 until 6AM on Friday, June 26. 9PM on Friday, June 26 until 6AM on Saturday, June 27.

 
Minimal  None 
21 & 1  Pavement Striping  South: Ramp,
Pavement striping at all I-190 interchange ramps. Pavement striping hand work will take place between 5 AM and 8:30 PM, Monday through Saturday, at all I-190 interchange ramps.

 
Minimal  None 


Back to Top

Rochester Region


For The Week Starting Monday 06/22/2026
Rochester Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
44 & 43  Road Work  East: Right shoulder,
WED 8AM-4PM

 
None  None 
43 & 45  Paving  West: Right lane,
SUN-SAT - Continuous

 
Minimal  Tow service during weekday rush hours 
45 & 43  Road Work  East: Alternating right lane with the left lane,
MON-WED 7PM-7AM, THU 8PM-7AM, FRI 9PM-8AM

 
Minimal  None 
44 & 45  Paving  West: Left lane,
SUN-SAT Continuous

 
Minimal  Tow service during weekday rush hours 
44 & 46  Paving  West: Left and center lanes,
SUN-SAT - Continuous

 
Minimal  Tow service during weekday rush hours 
45 & 46  Paving  West: Left lane,
MON 8PM-7AM, TUE-WED 6PM-7AM, THU-FRI 7PM-7AM

 
Minimal  Tow service during weekday rush hours 
46 & 44  Paving  East: Left lane,
SUN-SAT - Continuous

 
Minimal  Tow service during weekday rush hours 
46 & 45  Paving  East: Left lane,
MO-TUE 6PM-7AM, WED-THU 7PM-8AM

 
Minimal  Tow service during weekday rush hours 
47 & 45  Bridge Work  West: Left lane,
7AM on Monday, June 22 until 4PM on Friday, June 26.

West: Right lane,
7AM on Monday, June 22 until 4PM on Friday, June 26.

West: Right shoulder,
7AM on Monday, June 22 until 4PM on Friday, June 26.

East: Right lane,
7AM on Monday, June 22 until 4PM on Friday, June 26.

 
Moderate  None 
48 & 61  Pavement Striping  West: Ramp,
Pavement striping hand work will take place between 5 AM and 8:30 PM, Monday through Saturday, at interchanges and service area ramps between the Pembroke Travel Plaza and the PA State Line.

 
Minimal  None 
49 & 50  Road Work  West: Alternating right lane with the left lane,
8PM on Monday, June 22 until 6AM on Tuesday, June 23. 8PM on Tuesday, June 23 until 6AM on Wednesday, June 24. 8PM on Wednesday, June 24 until 6AM on Thursday, June 25. 8PM on Thursday, June 25 until 6AM on Friday, June 26. 8PM on Friday, June 26 until 6AM on Saturday, June 27.

 
Minimal  None 
61 & 48  Pavement Striping  East: Ramp,
Pavement striping hand work will take place between 5 AM and 8:30 PM, Monday through Saturday, at interchanges and service area ramps between the Pembroke Travel Plaza and the PA State Line.

 
Minimal  None 


Back to Top

Syracuse Region


For The Week Starting Monday 06/22/2026
Syracuse Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
34 & 32  Shoulder Work  East: Left shoulder,
THU 7AM-6PM

 
Minimal  None 
33 & 34  Road Work  West: Right lane,
TUE-THU 5AM-noon

 
Minimal  Weather permitting 
33 & 34  Bridge Construction  West: Right lane,
TUE-WED 6AM-10AM

 
Minimal  None 
34A & 34  Road Work  West: Left lane,
SUN 9PM-6AM, MON 7PM-7AM

West: Right lane,
SUN 9PM-6AM, MON-WED 7PM-7AM

West: Left lane,
SUN 9PM-6AM

West: Right lane,
SUN 9PM-6AM

East: Right lane,
MON 7PM-7AM

 
Minimal  None 
35 & 36  Shoulder Work  West: Shoulder,
MON-THU 7AM-4PM

 
Minimal  None 
35 & 36  Road Work  West: Left lane,
TUE 6AM-2PM

West: Right lane,
MON 6AM-1PM

West: Left lane,
WED 6AM-11AM

 
Minimal  Weather permitting 
38 & 42  Road Work  West: Right shoulder,
TUE-THU 6:30AM-3PM

 
Minimal  Weather permitting 
40 & 39  Road Work  East: Alternating right shoulder or left shoulder,
MON-FRI 7AM-5PM

East: Left lane,
SUN-THU 7PM-7AM, FRI 8PM-8AM, SUN 7PM-7AM

 
Minimal  None 
40 & 41  Road Work  East: Right lane,
TUE 6:30AM-noon

West: Left lane,
WED 6:30AM-10AM

 
Minimal  Weather permitting 
42 & 38  Road Work  East: Right shoulder,
TUE-THU 6:30AM-3PM

 
Minimal  Weather permitting 
41 & 42  Road Work  West: Right lane,
WED 5AM-10AM

West: Right lane,
TUE 5AM-10AM

 
Minimal  Weather permitting 


Back to Top

Utica Region


For The Week Starting Monday 06/22/2026
Utica Region

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
28 & 27  Bridge Work  West: Right lane,
Tuesday, 7:00AM - 2:00PM

East: Right lane,
Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
29 & 28  Road Work  East: Right lane,
Tuesday - Thursday, 7:00AM - 2:00PM; Friday 7:00AM - 12NOON

 
Minimal  Weather Permitting 
29 & 32  Road Work  West: Alternating right lane with the left lane,
MON-THU 8AM-2PM

 
Minimal  Weather permitting 
29 & 29A  Road Work  East: Right lane,
WED 8AM-2PM

East: Alternating right shoulder or left shoulder,
TUE noon-2PM

West: Alternating right shoulder or left shoulder,
TUE noon-2PM

 
Minimal  Weather permitting 
30 & 29  Road Work  East: Left shoulder,
FRI 6AM-10AM

 
Minimal  None 
30 & 29A  Road Work  East: Left shoulder,
WED-THU 6AM-5PM

West: Right lane,
TUE-WED 6AM-5PM, THU 6AM-1PM, FRI 6AM-10AM

East: Left shoulder,
TUE 6AM-5PM, WED 6AM-5PM

 
Minimal  None 
30 & 29A  Shoulder Work  East: Shoulder,
TUE-THU 8AM-4PM

West: Shoulder,
TUE-THU 8AM-4PM

West: Shoulder,
TUE-THU 8AM-4PM

West: Shoulder,
TUE-THU 8AM-4PM

East: Shoulder,
TUE-THU 8AM-4PM

 
Minimal  None 
31 & 30  Shoulder Work  East: Shoulder,
TUE-THU 8AM-4PM

 
Minimal  None 
30 & 31  Road Work  West: Right lane,
TUE 8AM-11AM

 
Minimal  Weather permitting 
31 & 30  Shoulder Work  East: Shoulder,
TUE-THU 8AM-4PM

 
Minimal  None 
30 & 31  Road Work  West: Alternating right shoulder or left shoulder,
WED 8AM-2PM

West: Right lane,
THU 8AM-noon

 
Minimal  Weather permitting 
30 & 31  Shoulder Work  West: Shoulder,
TUE-THU 8AM-4PM

 
Minimal  None 
30 & 31  Road Work  West: Left lane,
WED 8AM-2PM

 
Minimal  Weather permitting 
30 & 31  Shoulder Work  West: Shoulder,
TUE-THU 8AM-4PM

 
Minimal  None 
32 & 29  Road Work  East: Alternating right lane with the left lane,
MON-THU 8AM-2PM

 
Minimal  Weather permitting 
31 & 32  Road Work  West: Right lane,
TUE-THU 7AM-3PM

 
Minimal  Weather permitting 
31 & 32  Shoulder Work  West: Shoulder,
MON-THU 7AM-4PM

 
Minimal  None 
32 & 33  Road Work  West: Right lane,
TUE-THU 7AM-3PM

 
Minimal  Weather permitting 
33 & 32  Shoulder Work  East: Right shoulder,
MON 7AM-6PM

 
Minimal  None 
33 & 31  Road Work  East: Right lane,
TUE-THU 7AM-3PM

 
Minimal  Weather permitting 
33 & 32  Road Work  East: Shoulder,
MON-FRI 8AM-1PM

 
Minimal  Weather permitting 
33 & 32  Shoulder Work  East: Right shoulder,
TUE 7AM-6PM

East: Left shoulder,
WED 7AM-6PM

 
Minimal  None 
33 & 34  Road Work  West: Right lane,
TUE-THU 5AM-noon

 
Minimal  Weather permitting 
34 & 32  Shoulder Work  East: Left shoulder,
THU 7AM-6PM

 
Minimal  None 
33 & 34  Bridge Construction  West: Right lane,
TUE-WED 6AM-10AM

 
Minimal  None 


Back to Top

Albany Region


For The Week Starting Monday 06/22/2026
Albany Region

Berkshire I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
21A & B1  Bridge Construction  East: Right lane,
Monday, 7:00Am - 12:00 Midnight; Tuesday - Thursday, 12:00 Midnight - 12:00 Midnight *24 Hour Closure*; Friday, 12:00 Midnight - 4:00PM *Night Work*

 
Minimal  Weather Permitting 
B1 & 21A  Bridge Work  West: Right lane,
Monday - Friday, 7:00AM - 7:00AM *24 Hour Closure*

 
Minimal  Weather Permitting 
B1 & B2  Bridge Work  East: Left lane,
Monday, 7:00AM - 11:00AM

 
Minimal  Weather Permitting 
B3 & B2  Road Work  West: Right lane,
Wednesday - Thursday, 7:00AM - 2:00PM

West: Right lane,
Tuesday - Wednesday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
B2 & B3  Other  East: Right shoulder,
Monday - Wednesday, 7:00AM - 7:00AM *24 Hour Closure*

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Road Work  Direction: Interchange 23: Deceleration lane,
Monday, Wednesday - Thursday, 8:00AM - 2:00PM

 
Minimal  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Shoulder Work  Other  Direction: Interchange 26: Acceleration lane,
Wednesday - Thursday, 7:00AM - 5:00PM; Friday, 7:00AM - 3:00PM

Direction: Interchange 22: Deceleration lane,
Monday - Tuesday, 7:00AM - 5:00PM;

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Interchange Work  Road Work  Direction: Interchange 25: Alternating right lane with the left lane,
Tuesday - Thursday, 9:00AM - 2:00PM

 
Minimal  Weather Permitting 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
18 & 21  Pavement Striping  North: Alternating right lane with the left lane,
Sunday - Monday, 8:00PM - 6:00AM *Night Work*

 
Minimal  Weather Permitting 
19 & 21B  Other  North: Right shoulder,
Monday - Friday, 6:00AM - 5:00PM

 
Minor  Weather Permitting 
20 & 21  Bridge Construction  North: Left lane,
Tuesday, 5:00AM - 11:00AM; Wednesday, 5:00AM - 10:00AM

 
None  Weather Permitting 
21 & 18  Pavement Striping  South: Alternating right lane with the left lane,
Sunday - Monday, 8:00PM - 6:00AM *Night Work*

 
Minimal  Weather Permitting 
23 & 22  Other  South: Right shoulder,
Monday - Tuesday, 7:00AM - 5:00PM

 
Minimal  Weather Permitting 
24 & 23  Other  North: Right lane,
Friday, 7:00AM - 12NOON

North: Right lane,
Wednesday, 7:00AM - 3:00PM; Thursday, 7:00AM - 2:00PM

South: Right shoulder,
Tuesday - Wednesday, 7:00AM - 3:00PM

South: Right shoulder,
Monday, 7:00AM - 3:00PM

 
Minimal  Weather Permitting 

Mainline I-90
Between Exits Work Description Lane Closure Information Likely Impacts Comments
25 & 24  Paving  West: Left 2 lanes,
Munday, 9:00PM - 5:00AM *Night Work*

East: Left 2 lanes,
Thursday, 9:00PM - 5:00AM *Night Work*

 
Minimal  Weather Permitting 
24 & 25A  Paving  West: Left 2 lanes,
Monday, 9:00PM - 5:00AM *Night Work*

 
Minimal  Weather Permitting 
25 & 24  Paving  East: Left 2 lanes,
Wednesday, 9:00PM - 5:00AM *Night Work*

 
Minimal  Weather Permitting 
25A & 24  Paving  West: Right shoulder,
Monday - Wednesday, 6:00AM - 5:00PM

East: Right shoulder,
Thursday - Friday, 6:00AM - 5:00PM

East: Left 2 lanes,
Tuesday, 9:00PM - 5:00AM *Night Work*

 
Minimal  Weather Permitting 
25A & 25  Road Work  East: Right lane,
Tuesday - Thursday, 8:00AM - 2:00PM

 
Minimal  Weather Permitting 
25 & 25A  Guide Rail Installation  West: Left lane,
Tuesday - Friday, 7:00AM - 2:00PM

 
Minimal  Weather Permitting 
25A & 26  Guide Rail Installation  West: Right lane,
Tuesday - Wednesday, 7:00AM - 2:00PM; Thursday, 7:00AM - 12:00NOON

 
Minimal  Weather Permitting 


Back to Top

Mid-Hudson Region


For The Week Starting Monday 06/22/2026
Mid-Hudson Region

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Ramp Work  Ramp Work  Direction: Interchange 19: Ramp,
Monday - Friday, 6:00AM - 2:00PM

 
Minimal  Weather Permitting 
17 & 16  Bridge Inspection  North: Left lane,
Tues 8am-10am

North: Right lane,
Wed 8am-10am

South: Right lane,
Wed 11am-1pm

South: Left lane,
Tues 11am-1pm Thurs 9am-11am

 
Minimal  None 
18 & 17  None  North: Right lane,
Mon 5am-10am Tues-Wed 5am-12am Thurs-Fri 5am-7am

South: Right lane,
Mon 5am-8am Tues-Thurs 5am-12am Fri 5am-9am

 
None  None 
17 & 19  Road Work  North: Left lane,
Sunday, 9:00PM - 7:00AM; Monday - Tuesday, 6:00PM - 8:00AM; Wednesday, 8:00PM - 7:00AM; Thursday, 10:00PM - 7:00AM *Night Work*

 
Minimal  Weather Permitting 
18 & 19  Road Work  North: Left lane,
Sunday, 9:00PM - 7:00AM; Monday - Tuesday, 6:00PM - 7:00AM; Wednesday, 7:00pm - 7:00AM; Thursday, 9:00PM - 7:00AM *Night Work*

 
Minimal  Weather Permitting 
18 & 19  Ramp Work  North: Left lane,
Tuesday, 8:00AM - 11:00AM

 
Minimal  Weather Permitting 
18 & 21  Pavement Striping  North: Alternating right lane with the left lane,
Sunday - Monday, 8:00PM - 6:00AM *Night Work*

 
Minimal  Weather Permitting 
19 & 18  Ramp Work  South: Left lane,
Tuesday, 6:00AM - 9:00AM; Wednesday, 6:00AM - 10:00AM; Thursday, 6:00AM - 9:00AM

 
Minimal  Weather Permitting 
20 & 19  Ramp Work  South: Right lane,
Monday - Tuesday, 6:00AM - 9:00AM; Wednesday, 6:00AM - 11:00AM, Thursday, 6:00AM - 9:00AM

 
Minimal  Weather Permitting 
19 & 21B  Other  North: Right shoulder,
Monday - Friday, 6:00AM - 5:00PM

 
Minor  Weather Permitting 
20 & 19  Ramp Work  North: Right lane,
Tuesday - Wednesday, 6:00AM - 11:00AM; Thursday, 6:00AM - 9:00AM

South: Right lane,
Monday - Tuesday, 6:00AM - 9:00AM; Wednesday, 6:00AM - 11:00AM, Thursday, 6:00AM - 9:00AM

 
Minimal  Weather Permitting 
20 & 21  Bridge Construction  North: Left lane,
Tuesday, 5:00AM - 11:00AM; Wednesday, 5:00AM - 10:00AM

 
None  Weather Permitting 
21 & 18  Pavement Striping  South: Alternating right lane with the left lane,
Sunday - Monday, 8:00PM - 6:00AM *Night Work*

 
Minimal  Weather Permitting 


Back to Top

New York Region


For The Week Starting Monday 06/22/2026
New York Region

Cross Westchester I-287
Between Exits Work Description Lane Closure Information Likely Impacts Comments
6 & 1  Paving  West: Left and center lanes,
Mon 1am-6am Thurs 9pm-6am

 
None  None 
7 & 4  Paving  West: Left and center lanes,
Wed 9pm-6am

 
None  None 
8 & 4  Paving  West: Left and center lanes,
Mon 9pm-6am

 
None  None 
7 & 11  Bridge Construction  East: Other,
Rolling Sun 7pm-6am

 
None  None 
9 & 7  Bridge Construction  East: Other,
Rolling Mon-Thurs 8pm-6am

West: Other,
Rolling Mon-Thurs 9pm-6am

 
None  None 
9A & 11  Bridge Construction  East: Other,
Rolling Mon-Thurs 7pm-6am

 
None  None 
11 & 9  Bridge Construction  West: Right lane,
Mon-Fri 9AM-1PM

 
None  None 
11 & 9A  Bridge Construction  West: Other,
Rolling Mon-Thurs 7pm-6am

 
None  None 
11 & 7  Bridge Construction  West: Other,
Rolling Sun 10pm-6am

 
None  None 

Mainline I-87
Between Exits Work Description Lane Closure Information Likely Impacts Comments
1 & 4  Paving
Long Range: Pavement Markings 
North: Right and center lanes,
Wed-Fri 8pm-5am

North: Left and center lanes,
Wed-Fri 8pm-5am

 
Minimal  None 
1 & 6  Paving
Long Range: Pavement Markings 
North: Right and center lanes,
Wed-Fri 8pm-5am

North: Left and center lanes,
Wed-Fri 8pm-5am

 
Minimal  None 
5 & 4  None
Long Range: CARBO 
South: Right lane,
Wed 9pm-6pm

 
None  None 
5 & 3  Paving  South: Right lane,
Thurs 8pm-6am

South: Left lane,
Mon-Wed 8pm-6am Fri 8pm-9am

 
None  None 
4 & 7  Paving
Long Range: Pavement Markings 
North: Right and center lanes,
Wed-Fri 8pm-5am

North: Left and center lanes,
Wed-Fri 8pm-5am

 
Minimal  None 
7 & 16  Paving
Long Range: Pavement Markings 
North: Ramp,
Wed-Fri 9pm-5am

 
Minimal  None 
7A & 8  Bridge Construction  North: Right lane,
Mon-Fri 9am-3pm

North: Right shoulder,
Mon-Fri 9am-3pm

 
None  None 
9 & 7  Paving  South: Left and center lanes,
Wed-Thurs 8pm-5:30am Fri 9pm-6am

South: Right and center lanes,
Tues-Thurs 8pm-5:30am Fri 9pm-6am

 
None  None 
9 & 10  Bridge Work  North: Left lane,
Mon-Fri 9am-2pm

 
None  None 
14B & 15  Shoulder Work  North: Alternating right shoulder or left shoulder,
Mon-Fri 6am-3pm

North: Right and center lanes,
Mon 1am-6am Tues 7pm-6am Wed 8pm-6am Thurs 9pm-6am

North: Alternating right lane with the left lane,
Mon-Wed 6am-11am Thurs 9am-10am Fri 6am-7am

North: Left and center lanes,
Mon 1am-6am Tues 7pm-6am Wed 8pm-6am Thurs 9pm-6am

 
None  None 
15A & 14B  Shoulder Work  South: Left and center lanes,
Mon 1am-5am Tues-Wed/Fri 7pm-5am Thurs 9pm-5am

South: Right and center lanes,
Mon 1am-5am Tues-Wed/Fri 7pm-5am Thurs 9pm-5am

South: Alternating right shoulder or left shoulder,
Mon-Fri 10am-3pm

 
None  None 
16 & 15  Bridge Construction  South: Right shoulder,
Mon-Fri 9am-3pm

 
None  None 
16 & 7  Paving
Long Range: Pavement Markings 
South: Ramp,
Wed-Fri 9pm-5am

 
Minimal  None 

New England I-95
Between Exits Work Description Lane Closure Information Likely Impacts Comments
Shoulder Work  Shoulder Work  North: Alternating right shoulder or left shoulder,
Ramp AC, Ramp C, Ramp DR, Ramp CC, Ramp CRC Mon-Thurs 7pm-7am

South: Alternating right shoulder or left shoulder,
Ramp AA, GS, MXN, A Mon-Fri 7pm-7am

 
None  None 
18A & 14  Shoulder Work  North: Alternating right lane with the left lane,
Mon-Thurs 7pm-7am Fri 9pm-8am

North: Center lane,
Mon-Thurs 11pm-5:30am Fri 12am-6am

North: Other,
Full Closure Mon-Fri 10pm-6am

North: Right shoulder,
Mon-Fri 6pm-7am

South: Center lane,
Mon-Thurs 11pm-5:30am Fri 12am-6am

South: Alternating right lane with the left lane,
Mon-Thurs 8pm-7am Fri 9pm-9am

South: Right shoulder,
Night Mon-Fri 7pm-8am

 
None  None 


Back to Top